calculations
Bruce De Benedictis
bruce_de_benedictis at mac.com
Fri Jun 6 13:58:45 PDT 2008
I think the problem is that Panorama treats field names with numbers at the
end as line item fields. Someone else can probably say more about that.
Bruce De Benedictis
> Hi, PANO helpers; I use an iMAC, OS 10.5:
> Can someone help me on a perplexing problem?
> I have a datafile with 8 fields, P; I; S; R; N; R1; R2; R3;. All are
> numeric money fields except N which is numeric only. I use the
> EQUATION area in the DESIGN SHEET, Spreadsheet Mode, and for field S, I
> enter P*I;, for field R, I enter P+S. Calculations are proper.
> However, if I enter either of these equations, or any other equation,
> for fields R1, R2, or R3, no calculations are performed. However, if
> I change the "R" fields to other names, such as A, B, D, calculations
> perform properly. In other words, calculations fail if the last
> three field are similar. This does not seem right.
> Can someone point out the error of my ways ?
> Tom, Reno.
> _______________________________________________
> Qna mailing list
> Qna at provue.com
> http://provue.com/mailman/listinfo/qna
More information about the Qna
mailing list